Sunday, May 19, 2013

The latest local news, weather and high school sports from the Heartland

Transferring oil from broken well an option for BP
Posted: 07.09.2010 at 7:19 AM
0

THEODORE, Ala. (AP) — BP officials say the first of two relief wells being drilled to stop the Gulf oil gusher could be finished by the end of the month, but that's a best-case scenario. Such an optimistic timetable would require ideal conditions.

The Obama administration's point man says the backup plan would be transferring the crude to non-producing underwater wells that are miles away. Retired Coast Guard Adm. Thad Allen says BP would run the flow through pipelines across the floor of the Gulf of Mexico. Allen says that would take some construction and some time and would change the timetable to late August.

Still, the best hope to stop the spewing oil from the blown-out well a mile under the sea is the relief wells.

The leak began more than 2½ months ago following a deadly rig explosion off the Louisiana coast.


Copyright 2010 The Associated Press.

For more news and multimedia on the Gulf oil disaster, visit our Oil Spill section.

 

 

Popular Stories
Thumbnail
Pair accused of dealing drugs near school
John Garlock  |  Friday, May 17, 2013  |  4 comments
Thumbnail
Congratulations to the Schuyler County R-1 Class of 2013
Vanessa Alonso  |  Today at 6:04 PM  |  1 comment
Thumbnail
5K run paints outside the lines
Justin Andrews  |  Yesterday at 6:51 PM
Follow Heartland Connection
Get news and weather notifications on your phone by downloading the iPhone or Android app below
Sign up to get alerts and updates for breaking news, severe weather, and deals:
submit
ADVERTISEMENT
Special Features
Funeral Announcements
Announcements from area funeral homes
Featured Sponsors
Information from our experts
Your next car
View inventory from Lovegreen Ford Chrysler
Best Bets Auto
Auto information from our experts
ADVERTISEMENT